Laying up the wall......
Positioning and laying the last block that we helped with. Both gable ends will be layed with adobe block; which will require some 'high' work. We ran out of time to complete that part, but all the material is there for the finish. Lumber and tin had been hauled down by the cable system, and is there ready for the roof too.
This adobe building is being built for the 'caretaker' Indian family at the Ranch. Several months ago the small plywood building they used as a kitchen was destroyed in a huge wind burst. It was a tiny building (approx 8'X12') with a door and a window. The new building will have two rooms. I did not measure the size, but would guess it was 14'X24'.
Wednesday, June 13, 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment